XINTU Smart Equipment factory floor in Zhengzhou, with case packers and palletizers assembled and under test

The machines are the easy part.
Getting them to run in your plant is the work.

XINTU builds end-of-line packaging machinery — carton erectors, case packers, sealers, palletizers, wrappers, labellers, checkweighers, leak testers and conveyors. Nine product families, one factory, and a habit we have kept since the first machine left the floor: we build to the carton you actually ship, not to the one in the brochure.

9product families
CE+ ISO 9001
35days standard lead time
12months parts warranty
01 — Who we are

An end-of-line builder, not a catalogue of separate machines.

Most packaging equipment is bought one machine at a time, and then somebody has to make the machines talk to each other. That somebody is usually the customer. The erector discharges at one height, the packer wants another; the sealer runs at a different speed from the labeller; the palletizer needs a gap that nobody upstream is creating.

XINTU was set up to take that problem off the customer’s side of the table. We build the erector, the packer, the sealer, the labeller, the checkweigher, the wrapper, the palletizer and the conveyors that join them — and because we build all of them, the handovers between them are our problem, not yours. A line leaves here already talking to itself.

That is the whole proposition. Everything below is the evidence for it.

XINTU automatic case packaging line running cartons for the food and beverage industry
An assembled line under power before dispatch. The cartons on it are the customer’s own stock.
02 — How a machine gets made

Eight stages, and a photograph of each one.

Every machinery company claims to control its process. This is the sequence ours actually follows, in order, from a blank screen to a machine your operators have already run before it is crated. The stage that matters most is the one most suppliers skip — stage eight.

  1. Engineers developing the initial CAD layout of an automatic case packer

    Conceptual design

    Your carton, your product, your line speed and your available floor space go in first. The output is a layout showing what moves, in which direction, and where the operators stand — before any steel is cut.

  2. Detailed 3D model of an automatic case packer showing every component in place

    Detailed engineering

    Every component gets a dimension, a material and a tolerance. Sensors, actuators and the control architecture are selected here, not improvised on the assembly floor — which is why the electrical drawings and the mechanical drawings agree with each other.

  3. Prototype build of an automatic case packer used to validate the design before production

    Prototype, where the design is new

    On a standard model we skip straight to production. On a new format — an unusual carton, a product that will not slide, a pack pattern we have not run — we build the critical section first and find out on our floor instead of yours.

  4. Machined and fabricated components for XINTU packaging machines being produced and inspected

    Component manufacture

    Machining, welding and fabrication to the drawings above, with inspection against tolerance before the parts are released to assembly. Frame plate is ≥T3.2 Q345 stamped steel from Baosteel, Shougang or Ansteel stock — named suppliers, not “equivalent”.

  5. Mechanical assembly of a case packing machine including pneumatic and electrical integration

    Assembly

    Mechanical build, then pneumatics and hydraulics, then the electrical and control integration. One build team owns the machine from frame to first power-on, so nothing gets handed between departments with the reasoning lost.

  6. Commissioning and testing of an automatic case packer with its control system running

    Integration and test

    Controls loaded, sensors and actuators calibrated, then run as a line rather than as isolated machines. This is where a handover height that looked fine on paper turns out to be 15 mm out — and gets fixed here, at our cost, not on site at yours.

  7. Final adjustment and quality assurance checks on a packaging machine before shipment

    Final adjustment and QA

    Performance optimised, then the machine goes through the quality checks that decide whether it ships. We would rather find a marginal seal bar here than have you find it in the third week of a production run.

  8. Customer acceptance testing of an XINTU packaging machine using the customer's own cartons and product

    Customer acceptance — run on your cartons

    You are invited to run the machine, with your product and your cartons, before it is crated. Anything that does not behave gets fixed while the machine is still standing in our bay. This is the stage that separates a supplier from a partner, and it is the one most suppliers quietly skip.

Why stage eight matters more than the other seven. A machine that ran perfectly on our sample cartons and jams on yours is not a machine that was built badly — it is a machine that was never proved. Corrugated varies by supplier, by humidity and by the week it was made. Running your board before dispatch is the only test that predicts what your operators will actually experience.
03 — What we build

Nine families. One line, if you need the whole line.

Any of these can be bought on its own. They are listed in the order a carton usually travels, because that is also the order in which the handovers have to be got right.

Also quoted as turnkey projects: complete lines with AGV transfer to warehouse, checkweighers, machine-vision inspection cells and IoT-enabled factory systems.

04 — The plant

What “we have a factory” is supposed to mean.

XINTU Smart Equipment assembly floor with packaging machines in various stages of build and test
Machines in build and under power on the same floor. Nothing is assembled at a subcontractor and shipped straight out — the machine that arrives at your dock is the one that was tested in this bay.
Cut, form and weld in house

Frame plate, connection plates and guards are stamped and welded in our own shop. It is why we can quote ≥5 mm connection plates on a telescopic roller unit — we are not asking a supplier to hold a tolerance for us.

Named components, not “equivalent”

Siemens PLC and inverter, Mettler Toledo weighing sensors, Inovance servos, SICK photoelectrics, AIRTAC pneumatics, TaiBang inverters on the container line. When one of these fails, you can buy a replacement anywhere.

Two cabinets where two units run

On combined systems each unit gets its own enclosure, wired to national standard, with earth-fault protection. A fault on one unit can be isolated while the other keeps producing.

Stainless when the product asks for it

304 / 201 stainless frames, food-grade PU belting, waterproof quick-clean frames — specified where washdown or product contact makes it necessary, not sold as a default upgrade.

Cartons and trays staged for testing on XINTU packaging lines before export shipment
Customer board, staged for the acceptance run. The cartons are proof, not props.
05 — Getting it to you

A machine is only as good as its landing.

Exporting machinery is not hard. Exporting machinery that is running in week one is harder, and it comes down to three things that happen before the crate is closed: a documented acceptance run, a manual in your operators’ language, and a spares kit that travels with the machine rather than after it.

  • 35 business days standard lead time. Highly customised lines take longer, and we say so at quotation rather than at week six.
  • 5–15 business days of testing on a typical machine, before dispatch.
  • 12 months spare-parts warranty, with lifetime technical support behind it.
  • Training as on-site commissioning, online sessions, operation video and a written manual — all four, because plants differ in which one they can actually use.
Ask about lead time for your line
06 — Compliance

Certified, and willing to be checked.

Certificates are issued with the quotation documents. If your compliance team needs to review them before a purchase order, ask — that is a normal request, not an awkward one.

CEConformité Européenne marking on export machines
ISO 9001Quality management system, audited
GBChinese national standard, for domestic and export build

Electrical build follows national standard with insulated entry and exit openings and earth-fault protection on power cables. Where a destination market requires a variant — voltage, plug, guarding standard — it is built in, not retrofitted on site.

Next step

Send us the carton. We will tell you which machine it needs — or whether it needs one at all.

Carton dimensions, product weight, and the line speed you are trying to reach. That is enough for a first answer, and if the honest answer is that your volume does not justify automation yet, we will say that instead of quoting.

Scroll to Top