The machines are the easy part.
Getting them to run in your plant is the work.
XINTU builds end-of-line packaging machinery — carton erectors, case packers, sealers, palletizers, wrappers, labellers, checkweighers, leak testers and conveyors. Nine product families, one factory, and a habit we have kept since the first machine left the floor: we build to the carton you actually ship, not to the one in the brochure.
An end-of-line builder, not a catalogue of separate machines.
Most packaging equipment is bought one machine at a time, and then somebody has to make the machines talk to each other. That somebody is usually the customer. The erector discharges at one height, the packer wants another; the sealer runs at a different speed from the labeller; the palletizer needs a gap that nobody upstream is creating.
XINTU was set up to take that problem off the customer’s side of the table. We build the erector, the packer, the sealer, the labeller, the checkweigher, the wrapper, the palletizer and the conveyors that join them — and because we build all of them, the handovers between them are our problem, not yours. A line leaves here already talking to itself.
That is the whole proposition. Everything below is the evidence for it.
Eight stages, and a photograph of each one.
Every machinery company claims to control its process. This is the sequence ours actually follows, in order, from a blank screen to a machine your operators have already run before it is crated. The stage that matters most is the one most suppliers skip — stage eight.
-
Conceptual design
Your carton, your product, your line speed and your available floor space go in first. The output is a layout showing what moves, in which direction, and where the operators stand — before any steel is cut.
-
Detailed engineering
Every component gets a dimension, a material and a tolerance. Sensors, actuators and the control architecture are selected here, not improvised on the assembly floor — which is why the electrical drawings and the mechanical drawings agree with each other.
-
Prototype, where the design is new
On a standard model we skip straight to production. On a new format — an unusual carton, a product that will not slide, a pack pattern we have not run — we build the critical section first and find out on our floor instead of yours.
-
Component manufacture
Machining, welding and fabrication to the drawings above, with inspection against tolerance before the parts are released to assembly. Frame plate is ≥T3.2 Q345 stamped steel from Baosteel, Shougang or Ansteel stock — named suppliers, not “equivalent”.
-
Assembly
Mechanical build, then pneumatics and hydraulics, then the electrical and control integration. One build team owns the machine from frame to first power-on, so nothing gets handed between departments with the reasoning lost.
-
Integration and test
Controls loaded, sensors and actuators calibrated, then run as a line rather than as isolated machines. This is where a handover height that looked fine on paper turns out to be 15 mm out — and gets fixed here, at our cost, not on site at yours.
-
Final adjustment and QA
Performance optimised, then the machine goes through the quality checks that decide whether it ships. We would rather find a marginal seal bar here than have you find it in the third week of a production run.
-
Customer acceptance — run on your cartons
You are invited to run the machine, with your product and your cartons, before it is crated. Anything that does not behave gets fixed while the machine is still standing in our bay. This is the stage that separates a supplier from a partner, and it is the one most suppliers quietly skip.
Nine families. One line, if you need the whole line.
Any of these can be bought on its own. They are listed in the order a carton usually travels, because that is also the order in which the handovers have to be got right.
Carton erectors
Flat blanks to squared cases, with a gravity magazine topped up without stopping.
See carton erectors→
Case packers
Top-load, side-load, drop, wrap-around, robotic pick-and-place and tray packing.
See case packers→
Carton sealers
Top-and-bottom, full H-seal and seal-plus-strap, on standard BOPP tape.
See carton sealers→
Print & apply labellers
Receive, print, apply in one pass. 300 or 600 DPI, MES / ERP / WMS ready.
See labellers→
Leak & thickness testers
Non-destructive 100 % inspection for leaks, under-fill, bulging and thickness.
See leak testers→
Powder & granule fillers
Auger and volumetric filling, sized by how your product actually flows.
See fillers→
Stretch wrappers
Pallet wrapping with film force controlled, so the load is held without being crushed.
See stretch wrappers→
Palletizers
Collaborative and column robots, 8–12 cases per minute, up to 2,000 mm.
See palletizers→
Conveyors & container loading
Belt, roller, telescopic, chain and elevating conveyors — the parts that hold the line together.
See conveyors→Also quoted as turnkey projects: complete lines with AGV transfer to warehouse, checkweighers, machine-vision inspection cells and IoT-enabled factory systems.
What “we have a factory” is supposed to mean.
Frame plate, connection plates and guards are stamped and welded in our own shop. It is why we can quote ≥5 mm connection plates on a telescopic roller unit — we are not asking a supplier to hold a tolerance for us.
Siemens PLC and inverter, Mettler Toledo weighing sensors, Inovance servos, SICK photoelectrics, AIRTAC pneumatics, TaiBang inverters on the container line. When one of these fails, you can buy a replacement anywhere.
On combined systems each unit gets its own enclosure, wired to national standard, with earth-fault protection. A fault on one unit can be isolated while the other keeps producing.
304 / 201 stainless frames, food-grade PU belting, waterproof quick-clean frames — specified where washdown or product contact makes it necessary, not sold as a default upgrade.
A machine is only as good as its landing.
Exporting machinery is not hard. Exporting machinery that is running in week one is harder, and it comes down to three things that happen before the crate is closed: a documented acceptance run, a manual in your operators’ language, and a spares kit that travels with the machine rather than after it.
- 35 business days standard lead time. Highly customised lines take longer, and we say so at quotation rather than at week six.
- 5–15 business days of testing on a typical machine, before dispatch.
- 12 months spare-parts warranty, with lifetime technical support behind it.
- Training as on-site commissioning, online sessions, operation video and a written manual — all four, because plants differ in which one they can actually use.
Certified, and willing to be checked.
Certificates are issued with the quotation documents. If your compliance team needs to review them before a purchase order, ask — that is a normal request, not an awkward one.
Electrical build follows national standard with insulated entry and exit openings and earth-fault protection on power cables. Where a destination market requires a variant — voltage, plug, guarding standard — it is built in, not retrofitted on site.
Send us the carton. We will tell you which machine it needs — or whether it needs one at all.
Carton dimensions, product weight, and the line speed you are trying to reach. That is enough for a first answer, and if the honest answer is that your volume does not justify automation yet, we will say that instead of quoting.